The Safeguard Mechanism requires Australia's largest industrial facilities to keep net emissions under a legislated, stepping-down baseline — or offset the difference with carbon credits.

Not covered since 2023–24 — this facility's reported emissions have not reached the Safeguard Mechanism's 100,000t threshold since then. Figures below are its last reported year.
Darwin LNG Plant came in under its baseline in 2024–25 — reporting 10 kt against an obligation of 100 kt.
Source: Clean Energy Regulator · data as at 25 Oct 2026
10 kt
2024–25 emissions CER
100 kt
net baseline obligation CER
-90 kt
vs baseline Zerra calc.
—
ACCUs surrendered CER

Reported emissions vs baseline, 2016–17 to 2024–25

Red bars indicate emissions above baseline — covered by carbon credit purchases
0t491kt981kt1.5Mt2.0Mt16–1717–1818–1919–2020–2121–2222–2323–2424–25 Emissions Overage Baseline

Credit surrenders — Darwin LNG Plant

YearEmissionsBaseline Gap†ACCUsSMCsCompliance†
24–25 10 kt 100 kt -90 kt — — Under baseline
23–24 242 kt 100 kt +142 kt 141,538 — ACCU buyer
22–23 624 kt — — — — —
21–22 1.24 Mt — — — — —
20–21 1.59 Mt — — — — —
19–20 1.35 Mt 1.75 Mt -404 kt — — Under baseline
18–19 1.66 Mt 1.75 Mt -95 kt — — Under baseline
17–18 1.58 Mt 1.75 Mt -173 kt — — Under baseline
16–17 1.72 Mt 1.75 Mt -32 kt — — Under baseline

Emissions, baseline, ACCUs and SMCs are reported directly by CER. †Gap and compliance category are calculated by Zerra from those figures.

What this means

Darwin LNG Plant is a facility operated by Santos Limited in NT. Like all covered facilities, industrial operations generate significant emissions. Under Australia's Safeguard Mechanism, Darwin LNG Plant must keep its annual emissions below a stepping-down baseline — or purchase carbon credits to cover any overage.

In 2024–25, Darwin LNG Plant came in under its baseline — reporting emissions of 10 kt against an obligation of 100 kt, a surplus of 90 kt. Facilities that come in under baseline can generate Safeguard Mechanism Credits (SMCs), which can be sold to facilities that need to cover an overage.

Among 8 comparable facilities, 8 reported emissions above their baseline in 2024–25. The table below compares Darwin LNG Plant with other facilities covered by the Safeguard Mechanism in the same classification.

Related facilities — Safeguard Mechanism 2024–25

Facility Operator State Emissions vs Baseline Compliance
North West Shelf Project Woodside Energy Ltd. WA 5.75 Mt +921 kt ACCU + SMC
Gorgon Operations CHEVRON AUSTRALIA PTY LTD WA 9.02 Mt +478 kt ACCU buyer
Gippsland Basin facility ESSO AUSTRALIA RESOURCES PTY LTD VIC 1.63 Mt +305 kt ACCU buyer
Montara Operations JADESTONE ENERGY (EAGLE) PTY LTD NT 284 kt +163 kt ACCU buyer
Queensland Curtis LNG Plant QCLNG Operating Company Pty Ltd QLD 1.86 Mt +158 kt ACCU + SMC
APLNG Facility CONOCOPHILLIPS AUSTRALIA OPERATIONS PTY LTD QLD 2.21 Mt +147 kt SMC buyer
Pluto LNG Woodside Burrup Pty. Ltd. WA 1.89 Mt +145 kt ACCU buyer
Varanus Hub Santos Limited WA 313 kt +85 kt ACCU + SMC
← All Safeguard facilities
Source: Clean Energy Regulator — Safeguard Mechanism data · All figures in tCO₂-e · Data updated annually on CER release
All data sourced from the Clean Energy Regulator (Australian Government). Zerra is an independent data platform and is not affiliated with any listed facility or operator.